11-20-10: The pipe that will be put on the top center of the tower to hold the top of the tank in place. I was told the crew that will raise the tank will be in the week after Thanksgiving to raise the tank to the top. They will bring a very large crane to lift this pipe into place. |
12-1-10: All the equipment they used. |
12-2-10: The pipe (37 long) being raised to the top of the tower. |